Fleet Dashboard
Cypress Creek Solutions · C4 Control Center, Durham NC · 8 sites · 620 MW solar + 240 MW / 960 MWh storage · April 30, 2026
Fleet Generation
SCADA30-day rolling avg
Availability
SCADAWeighted avg, 30-day
Performance Ratio
ComputedWeather-adjusted, 30-day
Open Alerts
SignalsAs of Apr 30, 2026
SLA Risk
ContractApproaching contractual breach
Sites Needing Attention
Top 3 by impact
MV inverter block (INV 7-12, 12 MW) offline since Apr 10 — shared MV protection isolated block after INV-09 ground fault. Tracker rows 14-22 stuck since Apr 8.
BESS capacity fade 8.2% at 18 months — outside expected range (2-4%). SOH 91.8%. Two thermal events in last 30 days. Requires warranty / performance engineering review.
Block 4 (25 MW) generating 14% below model. String-level analysis shows systematic underperformance across 8 combiner boxes.
Fleet Generation Trend
Fleet-level generation and performance trends across all managed sites.
Region Summary
30-day rolling performance by region
| Region | Sites | Total MW | Availability | Perf Ratio | Gen vs Model | SLA Status | Status |
|---|---|---|---|---|---|---|---|
| Southeast (NC/GA) | 3 | 215 MW | 93.4% | 80.2% | -8.6% | 1 at risk | Concern |
| Mid-Atlantic (VA) | 1 | 100 MW | 97.1% | 81.5% | -5.2% | Healthy | Watch |
| Texas | 2 | 230 MW + 40 MW BESS | 94.8% | 83.1% | -3.8% | N/A (owned) | Watch |
| Mountain West (CO) | 1 | 75 MW | 98.2% | 79.8% | -4.1% | Watch | Watch |
| Storage Fleet | 2 | 240 MW / 960 MWh | 96.1% | RTE: 85.2% | — | 1 warranty review | Watch |