B
Bolo AI Agent·Cypress Creek Solutions

Fleet Dashboard

Cypress Creek Solutions · C4 Control Center, Durham NC · 8 sites · 620 MW solar + 240 MW / 960 MWh storage · April 30, 2026

Fleet Generation

SCADA
2,840MWh/day

30-day rolling avg

-4.2% vs prior month

Availability

SCADA
96.2%

Weighted avg, 30-day

-1.1 pp vs prior month

Performance Ratio

Computed
82.4%

Weather-adjusted, 30-day

-0.8 pp vs prior month

Open Alerts

Signals
5 / 8sites

As of Apr 30, 2026

Was 2 last month

SLA Risk

Contract
3sites

Approaching contractual breach

Was 0 last month

Sites Needing Attention

Top 3 by impact

Longleaf Solar80 MWThird-party

MV inverter block (INV 7-12, 12 MW) offline since Apr 10 — shared MV protection isolated block after INV-09 ground fault. Tracker rows 14-22 stuck since Apr 8.

$3.2K/day revenue loss·$18.5K April LD exposure
Inverter block outageTracker position faultDispatch required
EquipCriticalPerfCriticalSLABreach
Palmetto Energy Center80 MW solar + 40 MW / 160 MWh storageOwned

BESS capacity fade 8.2% at 18 months — outside expected range (2-4%). SOH 91.8%. Two thermal events in last 30 days. Requires warranty / performance engineering review.

Warranty escalation risk·8.2% capacity fade vs 2-4% expected at 18mo
Accelerated capacity fadeThermal eventEngineering review
EquipConcernPerfConcernSLAN/A
Cardinal Solar100 MWThird-party

Block 4 (25 MW) generating 14% below model. String-level analysis shows systematic underperformance across 8 combiner boxes.

SLA trending down — availability at 94.1% vs 97% target·~$1.2K/day at risk
Block-level underperformanceString anomalyInvestigate
EquipWatchPerfConcernSLAWatch

Fleet Generation Trend

Fleet-level generation and performance trends across all managed sites.

Region Summary

30-day rolling performance by region

RegionSitesTotal MWAvailabilityPerf RatioGen vs ModelSLA StatusStatus
Southeast (NC/GA)3215 MW93.4%80.2%-8.6%1 at riskConcern
Mid-Atlantic (VA)1100 MW97.1%81.5%-5.2%HealthyWatch
Texas2230 MW + 40 MW BESS94.8%83.1%-3.8%N/A (owned)Watch
Mountain West (CO)175 MW98.2%79.8%-4.1%WatchWatch
Storage Fleet2240 MW / 960 MWh96.1%RTE: 85.2%1 warranty reviewWatch

AI
AI Assistant

Generation Gap by Site
vs model
Longleaf
-18.4%
Bluestem
-7.4%
Cardinal
-5.2%
Sundance
-4.1%
Palmetto
-2.8%
Bay Tree
-2.4%
Shoe Creek
-1.2%
Suggested